You must be logged in and verified to contact the designer.
Product Description
The Milwaukee Railroad had high voltage power lines that parallel the track, in Montana, to provide power to the substations so as to energize the catenary. These would have been set about 28’ from the center line of the rails and spaced from 75' to as much as 150' apart.
There are 12 power poles in each set. Painting is not included. Note the detail in the insulators. I recommend you wash the parts with a light mix of dish detergent, rinse, and let dry before painting. I hope you enjoy the model.
We're sorry to inform you that we no longer support this browser and can't confirm that everything will work as expected. For the best Shapeways experience, please use one of the following browsers: